
Add to Cart
18650 Battery Pack Electrical Vehicle Aluminum Cooling Plate
1. Description of aluminum cooling plate
Processing steps: Cold stamping - cleaning - spray flux - fixture clamp the product into the brazing furnace - brazing furnace after more than a dozen procedures (automatic heating/insulation/cooling/welding, etc.) - do full inspection of air tightness test - cleaning (mainly for welding cleaning, polishing, drying) a total of more than 20 procedures.
1) Cladding Material
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
3003 | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.1 | 0.05 | 0.03 | 1 |
3003+1%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.5-1.50 | 0.05 | 0.05 | 2 |
3003+1.5%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 1.0-2.0 | 0.05 | 0.05 | 3 |
3003+1.5%Zn+Zr | 0.5-1.0 | 0.7 | 0.05-0.20 | 1.0-1.6 | - | 1.0-2.0 | 0.05-0.2 | - | 4 |
3003+0.5%Cu | 0.6 | 0.7 | 0.30-0.70 | 1.0-1.5 | - | 0.10 | 0.05 | 0.1 | 5 |
3005 | 0.6 | 0.7 | 0.20-0.40 | 1.0-1.5 | 0.20-0.60 | 0.25 | - | 0.01 | 6 |
Core Material
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
4343 | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.2 | - | 0.05 | 1 |
4343+1%Zn | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.5-1.5 | - | 0.05 | 2 |
4045 | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.2 | - | 0.2 | 3 |
4045+1%Zn | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.5-1.5 | - | 0.2 | 4 |
4004 | 9.0-10.5 | 0.8 | 0.25 | 0.1 | 1.0-2.0 | 0.2 | - | 0.2 | 5 |
2.Our advantages of 18650 Battery Pack Electrical Vehicle Aluminum Cooling Plate:
1. Since 2006, we have rich experience in this aluminum heat exchange industry in China;
2. Good reputation in household and industrial aluminum spare parts areas;
3. Design develop ability: We have design team to achieve your idea or give you suggestions;
4. Price advantage;
5. Good experience and cooperation with big clients in the world;
6. With Certificate ISO9001-2008;
7. Accept sample orders before bulk order;
8. High performance cost ratio;
9. Short delivery time and fast resolve problem attitude.
3.Terms and conditions:
1. Trade term: CIF / CFR / FOB / EXW
2. Payment term: 30% before production + 70% before shipment;
Or 100% Irrevocable L/C at sight;
Or we can further communicate with each other about this part;
3. Shipment time: Normally it is about 15-35 days.
4. FAQ